USU Design Requirements

Document Date
Division 14 - Elevators 8/4/23
Division 27 - IT Requirements/ 7/6/18
Division 00 - USU General Design Criteria 8/22
Division 1 - General Requirements 7/6/18
Division 2 - Surveys 1/2/12
Division 3 - Concrete 1/31/18
Division 4 - Masonry 1/2/12
Division 5 - Metals 1/2/12
Division 6 - Woods, Plastics, Composites 7/6/18
Division 7 - Thermal and Moisture Protection 7/6/18
Division 8 - Openings 8/4/23
Division 9 - Asphalt Specifications 2/21/23
Division 12 - Furnishings 7/6/18
Division 21 - Fire Suppression 9/29/22
Division 22 - Plumbing 1/11/23
Division 23 - HVAC 7/8/14
Division 26, 27, 28 - Electrical 11/11/09
Division 31 - Earthwork 1/2/12
Division 32 - Exterior Improvements 10/24/22
Division 33 - Utilities 2/6/23
Division 33 46 00 - Stormwater Management  
Postsecondary Education Facilities Inventory and Classification Manual 5/06